Automatic Destacker Loader Machine is a process where two or more PCB layers are stacked together. The purpose of doing so is mainly to save space and improve the integration of the board. ¬--SHENZHEN SHENGDIAN ELECTRONIC EQUIPMENT CO.
The following are the steps of PCB board Automatic Destacker Machine SMT equipment operation process:
1. Preparation:
a. Ensure that all the PCB boards to be used have been designed and reviewed.
b. Prepare the stacking trigger required appliances and tools, such as fixtures, glue, etc..
c. Clean the work area to ensure that the work area is neat and dust free.
2. Layer inspection:
a. Check each PCB board for proper circuit connections and ensure that the dimensions of each board match the requirements.
b. Check for any damage, scratches, or dirt on the PCBs.
3. Perforate:
a. Use drilling equipment to drill holes in locations to be punched and ensure holes are accurate.
b. Surface treatment, such as gold plating, may be applied as required.
4. Prepare adhesives:
a. Select appropriate adhesives, e.g. epoxy glue, as required.
b. To ensure bonding effectiveness, proportion and mix accurately according to adhesive instructions.
5. Stacking board layers:
a. Place the first layer of PCB boards on the workbench and apply the adhesive evenly to the surface of the boards according to the design requirements.
b. Place the second layer of PCB on top of the first layer, taking care to align the holes and connectors.SMT Equipment Factory
6. Repeat the above steps until all PCB layers are stacked. Fixtures can be used to secure the bonded layers as needed.
7. Determine the curing time:
a. Determine the curing time according to the requirements of the adhesive used. Typically, this process may take several hours or even more than a day at the proper temperature.
b. Ensure that ambient temperature and humidity remain stable during the curing period.
8. Inspection and repair:
a. After curing is complete, inspect the PCB board after the stacking trigger for any problems, such as misaligned holes, uneven pressure between layers, etc.
b. If problems are found, they can be repaired or re-triggered at this stage.
9. Testing and acceptance:
a. Upon completion of the stacking trigger, perform a thorough electrical test and visual inspection to ensure that the connections between each ply are normal and stable.
If any problems are found, repair and re-test promptly. b. If any problems are found, repair and re-test promptly.
It should be noted that this is only an overview and does not cover all details and special cases. In practice, be sure to operate according to the specific requirements and materials, and follow the relevant standards and specifications.SMT Equipment Factory