Home » News » Systematic Maintenance Procedures for Semi-Automatic Solder Paste Printers

Systematic Maintenance Procedures for Semi-Automatic Solder Paste Printers

Views: 0     Author: SHENGDIAN     Publish Time: 2025-09-17      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Systematic Maintenance Procedures for Semi-Automatic Solder Paste Printers, Integrating Routine Care with Key Deep-Clean Points:

I. Daily Maintenance (10-Minute Process)

Cleaning and Inspection

Wipe the machine body, display, and keypad area with a well-wrung soapy water cloth (do not use alcohol)

Verify air supply pressure (≥0.45 MPa), secure stencil holder fastenings, and inspect squeegee blade wear (replace if notches exceed 0.1mm)

Conduct parallelism check on feed rails (feeler gauge measurement ≤0.05mm)

Abnormal Condition Management

Immediately affix red labels to any scratches or abnormal noises detected; generate weekly anomaly heatmaps to analyse high-frequency fault points

II. Weekly Maintenance (30-minute in-depth servicing)

Pressure supply system maintenance

Note airflow direction when removing filters; install automatic drain valves to prevent water accumulation

Precision component lubrication

Apply spray lubricant to stencil rails; apply grease to ball screws at 1.5 times thread pitch

Hidden Contamination Inspection

Wipe camera lenses with lens paper and anhydrous ethanol; inspect ball screw grooves for residue via endoscopy.

III. Monthly Maintenance (1-hour comprehensive inspection)

High-Risk Component Inspection

Prioritise mechanical systems, stencil tension (decommission if attenuation >15%), and squeegee wear.

Steel Mesh Cleaning Protocol

Small-to-medium batch production: Manual machine wiping + quarterly ultrasonic maintenance (40kHz ultrasonic cleaning for 0.15mm micro-pores)

High-volume production: Install inline spray cleaning system; inspect mesh apertures with 10x magnifier after each wash

实拍53

IV. Critical Precautions

Environmental Control: Maintain workshop temperature 22–28°C, humidity 40–60%, prevent dust from compromising print accuracy

Safety Regulations: Prohibit simultaneous operation by two personnel; do not insert limbs into equipment during operation

Data Calibration: Calibrate intelligent system data quarterly to prevent cumulative registration accuracy errors

Recommendation: Maintain a Maintenance Inspection Log to record parameters for each service; handle anomalies per the red-tag procedure.


Telephone

+86-135-5475-8169
​Copyright © 2024 SHENGDIAN ELECTRONICS. All Rights Reserved.
Technology by leadong.com

Support

About

Subscribe to our newsletter

Promotions, new products and sales. Directly to your inbox.